How a U.S. oil and gas producer reported 750+ weekly inspections faster
A U.S. oil and gas producer was running inspections under a consent decree and New Mexico’s ozone precursor rule. The program included AVO surveys, Method 22 observations, and LDAR or OGI surveys, with 250+ potential corrective actions. Reporting for 750+ weekly inspections was faster. The published account also reports more reliable data, fewer errors, and a reduced risk of penalties.
Weekly inspections with faster reporting
Potential corrective actions in the program
01
The challenge
A U.S. oil and gas producer was running an inspection program under a consent decree and New Mexico’s ozone precursor rule. The penalty exposure named with those requirements is $8,000 a day and $800,000 per facility per month.
The inspections included AVO surveys, Method 22 observations, and LDAR or OGI surveys, with 250+ potential corrective actions.
02
The approach
Leave the body empty. The live block does not say how the work was assigned or which system held the record. An empty body hides the section. The results block will still be numbered 03 until that section is filled. Do not fill it from the product cards on the environmental compliance page.
03
The results
More customer impact
- 2,300+ hours Annual time saved in monthly Scope 1 reporting North American midstream operator How a North American midstream operator saved 2,300+ hours a year on Scope 1 reporting Midstream emissions reporting →
- 2,500+ Well sites generating emissions data Upstream oil and gas producer How an upstream oil and gas producer centralized emissions data from 2,500+ well sites Upstream emissions reporting →